MIXED MATERIALS:

Construction/Renovation

Recybac location de conteneurs

10 Yards

Includes 2 tons

Recybac location de conteneurs

14 Yards

Includes 2 tons

Recybac location de conteneurs

18 Yards

Includes 3 tons

Recybac location de conteneurs

20 Yards

Includes 3 tons

SPECIFIC MATERIALS:

Asphalt / Concrete / Earth / Brick and mortar

Recybac location de conteneurs

10 Yards

Asphalt  and rock only

maximum 3/4

Includes 8 tons

Recybac location de conteneurs

10 Yards

Concrete only

maximum 3/4

Includes 8 tons

Recybac location de conteneurs

10 Yards

Brick and mortar only

maximum 3/4

Includes 5 tons

Recybac location de conteneurs

10 Yards

Earth and peat only

maximum 3/4

Includes 8 tons

CONDITIONS:

Accepted/rejected materials

Mixed materials:

CONSTRUCTION/RENOVATION

Nunber of days included: 1 to 10 days (possibility of more or less). 1 to 20 days for the 40 yards

Extra day: 85$ plus taxes every extra tons. Prorata charged

Reservation: 24 hours in advance if possibile.

Rejected materials: Chemical products/paint/couches/mattresses/tires, etc (Min. 40$ fee)

Contaminated materials: Strictly prohibited.

SPECIFIC MATERIALS:

ASPHALT/CONCRETE/EARTH/BRICK AND MORTAR

Number of days included: 10 days.

Reservation: 24 in advance in possible.

Rejected materials: Any materials other than the specified one.

We are able to answer all your questions from 5:30am to 8pm, 7 days a week

To make a container change, we recommend you call 1 day in advance.

 

Accepted payment methods (when making the reservation): Visa, MasterCard, and Interac.

 

*Prices can change without notice. Taxes not included. Credit card will be needed at the reservation.

In order to improve our services, we would like to know your opinion.

Express yourself here